Central Desalination Plant at Sur Water Supply Scheme at Al Sharqyah Region

 

Tender No.             : 136/2005

Contract Value    : 4,4750,000.000 R.O
Client                     : Public Authority for Electricity &Water
Consultant            :  Energoprojekt    Entel LLC
Main Contractor    : Societe Egyptiene D’Entraprises ( Moukhtar Ibrahim ) – SEDE

 

Our scope :

  1.  Main Forwarding pumps complete with electrical. Motors including hydraulic calculations like duty point NPSH calculation pump and motor selection etc..
  2. Fire Fighting Pumps and related piping works
  3. Domestic water pumps  and related pipe works
  4. Sump Pumps
  5. Diesel  generator and accessories ( day and bulk fuel tanks, AMF panel fuel transfer pumps and piping , battery and battery charger , exhaust piping system and Supports, etc…)
  6. Water hammer protection vessels/system including Surge analysis study , for pressure vessels and pipeline, main vessels with cat ladder , pipe fitting ,valves, air compressors with air piping , level indicators, level switches, Safety valves control panel cables, etc…
  7. Pump Houses Piping and valves up to end of wall pieces or 1 meter out of the building wall of each pump house including pipe fitting with gaskets, bolts , and any required jointing material and pipe supports.
  8. Medium Voltage and Low voltage Switchgear MCC’s, Capacitors, 30 V.DC. Source battery charger and batteries including designing drawing electrical calculations colorations study protection study,  with all  necessary interfacing with SCADA
  9. Power and Control Cables, Cable Trays, etc….
  10. Elect. Bus duct and bus trucking system complete with elbows, flex Pieces.
  11. Overhead Crane including all girders, steel runway beams Power Cables, Flex Cables and Control Panels.
  12. Cat and Mouse Mechanical level indicators for all Ground Reservoir.
  13. All pipe work of Tanker filling Stations include Prepaid card system vender machines
  14. Put control philosophy for the project and prepare all hardware signals to SCADA calibrate and commissioning Motor Operated Valves with complete coordination supervision.
  15. Commissioning, Testing, 90 Days Trail Operation and Maintenance works completion
  16. Give advise design  and recommendations  to Main Contractor regarding air valve at pipeline (type, Quantity,  and location) Orifice  plate ( location, size, design, and detailed fabrications), Flow Control Valves.
Construction of Sewerage Network and Sewage Treatment Plant at Samail Town

 

Tender No.             : 141/2005

Contract Value     : 375,000.000 R.O

Client                      : Ministry of Regional Municipalities & Water Resources (MRM&WR)
Consultant             :  National Engineering Services Pakistan & Partners  NESPAK

Main Contractor     : ERKO Oman LLC

 

Our scope :

  1. Engineer Supply, install, commissioning and startup as follows:                                                Electrical works for all 4 locations, electrical switchgears MCC, power and control cables
  2. Consultancy, supervise and commissioning all mechanical works like pumps, oxidation ditches clarifier, Filterers Odor control, etc..
  3. Install all SCADA panels, RTU, instrumentations, cables, etc..
  4. Trail operation for 90 days
Water supply of Bidbid Fanja, Samil Twon Phase 2

 

Tender No.                  : 132/2005

Contract Value          : 2,178,000.000 R.O
Client                           : Public Authority for Electricity and Water
Consultant                  : Mott Macdonlad & Company LLC
Main Contractor          : ERKO Oman LLC

 

Our scope :

 

Engineer Supply, install, commissioning and startup as follows:                                                                   

  1. 11 KV main switchgear for 3 Pump Stations MPS BPS1, and BPS2
  2. Motor Control Center and Soft starter for 3 pump Stations MPS, BPS1, and BPS2.
  3. Low voltage switchgear for  all auxiliary power supply for MPS BPS1 BPS2
  4. Supply and laying Cables, cable tray between 11 KV switchgear, MCC, Soft starter and 11 KV Electrical Motors
  5. Supply and laying Cables, cable tray between Low voltage switchgear and all Auxiliary equipment like Actuator valve, compressors,
  6. Install all SCADA, panels RTU instrumentation, etc..
  7. Consultancy and supervise pumps motors , pipe work and cooling system
Water supply of Samial IZKI Nezwa Twon

 

Tender No.             : 141/2005

Contract Value     : 1,369,000.000 R.O
Client                      : Public Authority for Electricity and Water
Consultant             : NJS Consultants form (Samail to IZKI)
: Energoprojekt    Entel LLC ( IZKI to Nezwa)
Main Contractor    : ERKO Oman LLC

 

Our scope :

 

Engineer Supply, install, commissioning and startup as follows:                                                                   

  1. Low voltage main switchgear for 2 Pump Stations BPS3, and BPS4
  2. Motor Control Center and variable Speed Drive  for 2 pump Stations BPS3, and BPS4.
  3. Low voltage switchgear for all auxiliary power supply for BPS3 BPS4
  4. Bust Duct system 5000 A and 3200 A between Main LV switchgear and Transforms
  5. Supply and laying Cables, cable tray between Low Voltage switchgear, MCC, VSD and Electrical Motors.
  6. Install all SCADA, panels RTU instrumentation, etc..
  7. Install pumps, and motors, pipe work valves etc.
  8. Install overhead crane for both pump stations BPS 3 and BPS 4 ( 7.5 ton amd 6 Ton)
Design, Supply and install water control system in Barka Pumping Station

 

Contract Value          : 150,000.000 R.O
Client                           : Public Authority for Electricity and Water
Main Contractor          : Mazoun Establishment for Contracting & Genral Trading

 

 

Our scope was turn Key Design ,Supply, install, and commissioning complete electromechncial and SCADA works and all necessary civil works to out in operation control system for water conductibility system in Barak Pumping Station